Clicarity โ€บ Wire Cable
๐Ÿ”Œ Industry ยท Wire & Cable Manufacturing

How many drums went out short, and who found out first?

Whether measured length matches ordered length, drum by drum. Which process is really losing your copper. Why the extruders actually stopped.

One plant had sixteen short-length complaints in a quarter. Every one was discovered by the customer, not at dispatch.
Wire and cable manufacturers, drum-wise production visibility live
As featured in PrintWeek India, April 2026 โ†—

Three plants. Each one trusted a counter that nobody was checking.

01 The drum that was short

A customer orders a length. The drum that reaches him is a metre or two short, or ten.

Length is measured by a counter, and counters drift. Nobody records measured against ordered per drum, so shortages are discovered by the customer rather than at dispatch.

Length complaints, one quarter
Short delivery16 drums
Counter drift8 drums
Wrong drum shipped4 drums

Measured length is recorded per drum against the order, and a drum below tolerance cannot be dispatched.

16 โ†’ 3short deliveries per quarter
Show me howFifteen minutes. We look at one drum.
02 Copper, and where it went

Copper is the cost. Input weight and output weight are both known and rarely compared closely enough to act on.

A drawing line that has drifted, or a die worn past its life, loses a fraction of a percent that is invisible monthly and enormous annually.

Copper loss by process, one month
Rod breakdown0.7%
Intermediate drawing1.1%
Fine drawing2.6%
Stranding0.4%

Weight in and weight out are recorded at every process, so a drifting line is visible in weeks.

2.6% โ†’ 1.2%on the process that was losing
Find out howBring last month. Fifteen minutes.
03 The extruder that kept stopping

Extrusion lines stop for material changes, breaks, screen changes and faults. Every stop wastes material at start-up as well as time.

Stops are known to the operator and to nobody else. The reason is rarely captured, so a recurring cause is never separated from an occasional one.

Extruder downtime, one month, cause
Material changeover21 hrs
Wire break34 hrs
Screen change10 hrs
Breakdown8 hrs

Each stop is logged against the line with a reason from your own list, on the same screen the operator already uses.

34 hrs โ†’ 12 hrsdowntime from wire breaks
Show me howFifteen minutes. We set up one line.

Copper loss and short drums are both small percentages. Both are enormous once a year.

Every drum. Every stage. Every test result tracked.

This is how a print job moves through your business. Clicarity gives you live visibility at every phase, and flags delays before they become client calls.

01
Order & Planning
3 stages
Order Received
Customer order confirmed, cable type, size, length, standard, delivery date.
โœ“ Clicarity: Job ID and drum ID created, material planned
Raw Material Planning
Copper/aluminium rod, insulation compound, armour wire, sheathing compound planned.
โš  โš  Common delay: copper rod shortage, entire production schedule shifts
Rod Procurement
Copper or aluminium rod procured with test certificate.
โœ“ Clicarity: Rod lot number recorded, traceability from rod to finished drum
02
Conductor Manufacturing
4 stages
Rod Drawing
Copper or aluminium rod drawn down to required conductor size.
โœ“ Clicarity: Drawing speed and wire diameter logged, deviation flagged
Annealing
Drawn wire annealed for required flexibility.
โš  โš  Common delay: annealing furnace issue, wire becomes brittle, batch scrapped
Stranding / Bunching
Multiple wires stranded or bunched to form conductor.
โœ“ Clicarity: Pitch and lay length logged per drum
Conductor Electrical Test
Resistance and continuity tested on conductor before insulation.
โœ“ Clicarity: Test result logged, insulation cannot start without pass
03
Insulation & Core Making
3 stages
Insulation Extrusion
Insulation compound extruded over conductor at required thickness.
โœ“ Clicarity: Insulation thickness and eccentricity logged per drum
Spark Testing
Each insulated core spark tested for insulation integrity.
โš  โš  Common delay: spark test failures, core re-insulated, material wasted
Core Identification
Cores colour coded or numbered per cable standard.
04
Cabling & Armour
3 stages
Cabling / Laying Up
Individual cores laid up into multi-core cable formation.
โœ“ Clicarity: Cable length per drum tracked, order length vs produced length
Armour / Bedding
Steel wire armour or aluminium armour applied where required.
โš  โš  Common delay: armour wire run-out, production stops mid-drum
Outer Sheathing
PVC or XLPE outer sheath extruded over armour.
โœ“ Clicarity: Sheath thickness logged, final drum length confirmed
05
Testing & Dispatch
3 stages
Final Electrical Testing
Finished cable tested per IS/IEC standard, voltage, resistance, insulation resistance.
โœ“ Clicarity: Test results logged per drum, dispatch blocked until pass
Drum Marking & Packaging
Drum marked with cable details, length, and batch number.
โœ“ Clicarity: Drum length verified against order before dispatch
Dispatch
Drums dispatched with test certificates and delivery challan.
โœ“ Clicarity: Full traceability from rod lot to dispatch preserved
""Testing used to be the last thing, and failures meant rework after the full cable was made. Now we track electrical tests at each stage. We catch issues at insulation, not after armour and sheathing are done.""
PR
Production Head
Wire & Cable Manufacturer. Silvassa
As featured in PrintWeek India, April 2026. Vol 18, Issue 12 โ†— Also in Print Bulletin, May 2026. Pages 20โ€“21 โ†—

What improves in wire and cable businesses using Clicarity

โ†“ 60%
Rework from late-stage test failures
โ†‘ 35%
On-time dispatch improvement
โ†“ 45%
Copper wastage reduction
5 days
To go live, full setup included

Questions from wire cable businesses

How does Clicarity work for a printing business specifically?
Clicarity is configured around your specific print workflow, pre-press, printing, finishing, dispatch, in your terminology. Every job gets a unique ID and moves through your defined stages. You see live status, timestamps, and alerts when a job sits too long at every stage. The Clicarity team builds everything for you. You go live in 5 days.
Does it work for both offset and digital printing?
Yes. Clicarity works for any print process, offset, digital, wide format, screen printing, or a combination. The stages are configured around your actual workflow. If offset jobs go through plate making and digital jobs skip that stage, both can be tracked correctly under the same system.
Can it track material wastage at each stage?
Yes, with the Multi Licence. At every stage, your team logs quantity in and quantity out. Clicarity calculates the loss automatically. You see wastage by stage, by job, live, not at month-end when nothing can be done about it.
Will my press operators actually use it?
Yes. The update screen has two fields. Job ID and status. Under a minute. No training needed. GP Offset's entire team was using it from day one, including floor workers who had never used a software system before.

See every drum. Every stage. Before the test fails.

Book a free demo. We'll map your wire and cable workflow live on the call.

No commitment Live in 5 days Annual licence Full setup included